Stesen Titiwangsa: Perbezaan antara semakan
Kandungan dihapus Kandungan ditambah
→Integrasi dengan bas RapidKL: keep it update |
Tiada ringkasan suntingan |
||
Baris 36:
Image:Titiwangsa station (Star Line), Kuala Lumpur (February 2007).jpg|Platfom [[Laluan Ampang]] di bahagian stesen LRT.
</gallery>
</center><h2>Susun atur stesen</h2>
Seamless physical and fare integration was achieved on 1 March 2012 when the "paid-up" or restricted areas of both the LRT and monorail stations, which previously operated as two separate stations, were linked up, allowing passengers to transfer without needing to buy new tickets for the first time since the monorail became operational in 2003.
|